Ironsand
A distillation column wrapped in scaffolding at dusk, crews in orange coveralls on every level, floodlights lit against a deep blue sky over the Gulf.

We work when the plant stops.

Maintenance, shutdowns, insulation and fabrication for refineries, petrochemical and power plants in Jubail and across the Kingdom.

Plants are built to run. Our work is everything in between: we open them up, clean them, fix them and hand them back on the day we promised.

A 30-day shutdown, in one view.

Every turnaround follows the same arc. Move through ours: six phases, one schedule, one team accountable for all of it.

Day 1 of 30

Drag the slider, or select a phase, to move through the days.

Phases

1-3

Isolate and prepare

Isolations proven, permits issued, scaffolding and access erected before the first bolt is touched.

What we do.

Sectors we work in.

Recent work.

A welder joining a pipe flange, sparks flying against a grey steel background.

Nobody starts until the permit says it is safe.

  1. 01

    Every task has a method statement and a permit.

  2. 02

    Supervisors stop work first and ask questions after.

  3. 03

    Near misses are reported and shared the same day.

Planning a shutdown? Talk to us early.

The sooner we see the scope, the better the plan. Send us the site, the scope and the dates.